Builder Name:Johnny King   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:1210.7
Total Expense:$139041.55
Start/Last Date:Jul 21, 2020 - No Finish Date
Engine:IO-390-EXP119 Thunderbolt
Propeller:Undecided
Panel:Undecided
 
Friendly URL: https://eaabuilderslog.org?s=507KF

Home or Last Project Picture

Jan 15, 2023     5th sealant; redoing drain holes, filet sealing ribs, Tank attach bracket R wing - (3 hours)       Category: Fuel System
We started by taking off the drain valves on both tanks since we realized we did not seal them well enough. Mixed 6.6oz of sealant and reinstalled those no problem with a proper seal as well as sealed the shop heads on the aft inboard tank rib assemblies. We filet sealed and encapsulated all the rivets for each of the ribs in the right wing tank and installed the tank attach bracket. We used as much of the remaining sealant as we could on the left tank before we ran out.


 